PARTS STATUS CODES: -

S - Parts in Store
P - Some Parts in Store
C - Parts common to other BR Classes without modification
A - Parts could be adapted from other BR Classes (modified)
M - Parts not available from either C or A - would have to be manufactured
X - Parts available from various other sources incl. other (supportive) groups and relics sales such as Quorn, eBay, etc.

Note - Where more than one code is listed, then more than one option applies - there are several solutions to the missing part(s) depending on 'what turns up'

45015 Work Plan 2008 (Year 1) (Stage 1) Immediate Work and Preparation for Dismantling
Job No.  Description 
Equipment Involved 
Part Status
Remarks 
 S
P
C
A
M
X
 101 Board up access to all cab doors (due to safety reasons) All cab doorways
 
 
 
 
 
 
Until Further Notice
 102 Reinstate No.1 wheelset Replacement springs; hangers; coil springs
S
 
 
 
 
 
Assess No. 1 wheelset axle bearings (SKF) for service condition
 103 Oil up all fastenings at least 3 times with thin oil/WD40 All fastenings
 
 
 
 
 
 
Except where very heavily corroded - to be cut/burnt off after noting fastening details
 104 Make notes of arrangement of all equipment, e.g. roof lining, pipework, etc., to completion All equipment where required
 
 
 
 
 
 
To include photographic records
 105 Label up parts in conjunction with 4) to completion All equipment where required
 
 
 
 
 
 
Labels to be serviceable
 106 Installation of workshop and stores facility with shelving/racking. Acquisition of tools for workshop Purchase of Mk1 vehicle + flat wagon (or container)
 
 
 
 
 
 
Mk1 BG acquired (2003) but stored off site OOU. Flat wagon or container now optional. Permission may not be given for BG onsite in addition to locomotive (Note 1)
45015 Work Plan (Year 1/2) (Stage 2) Dismantling
Job No.  Description 
Equipment Involved 
Part Status
Remarks 
 S
P
C
A
M
X
 201 Remove all large items of equipment from locomotive and relocate to 1) stores or 2) flat wagon and sheet over or (3) storage facilities away from the present site Engine room roof panel
Silencer panel
Engine/generator unit
Boiler (in arrangement with asbestos removal)
Brake frame
Vacuum exhauster
Electrical control cubicle
Radiator fan grille
Radiator fan assembly/tunnel
Fuel tanks (2)
Water tanks (2)
Main air reservoirs (6)
Battery boxes (2)
Body side grilles (2) + (2)
 
 
 
 
 
 
 
45015 Work Plan (Year 2/3) (Stage 3) Restoration - External
Job No.  Description 
Equipment Involved 
Part Status
Remarks 
 S
P
C
A
M
X
 301 Restoration of body shell including underside. Removal of cab structures. Eliminate all corrosion. New plate where required Cab structure
Nose end assembly
Nose end floor
Bodyside and cantrail areas
Boiler room floor area
 
 
 
 
 
 
Repaint in BR blue - transfers; BR >>
 302 Restoration of bogies (outside only) Remove all rust and corrosion. Paint in black
 
 
 
 
 
 
 
 303 Manufacture of missing or corroded bodyshell items Doors
Handrails
Boiler room roof panel
Gutter sections
Silencer panel (if too corroded)
Bodyside (filter on 46's) cover panels
Nose end filters
 
 
 
 

M
M
M
M
M

M

M

 
Or repair existing item
 304 Sourcing of missing bodyshell items Various solebar fittings - cocks and drain taps
Wiper arms, blades
 
 
C

C
 
 
 
 
 305 Recondition existing bodyshell items Engine room roof panel
Radiator fan grille
Main air reservoirs (6)
Battery boxes (2)
Bodyside grilles (2) + (2)
Wiper motors
 
 




P
 
 
 
 
All items of equipment to be bench tested for operation/checked for calibration before installation
 306 Manufacture of missing bogie items  Sand valves
Sand pipes *
 
 
 
 
M
M
 
All items of equipment to be bench tested for operation/checked for calibration before installation
 307 Sourcing of missing bogie items Sandboxes
Sand pipe brackets
Steps
 
 
 
 
 
X
X
X
 
 308 Recondition existing bogie items Sandboxes
Sand pipe brackets
Steps
Speedo drive
Distance counter



S
S
 
 
 
 
 
All items of equipment to be bench tested for operation/checked for calibration before installation
 309 Fitting parts from Jobs 303 - 305 to completion
(Group A - External Completion Components)
As Listed
 
 
 
 
 
 
 
 310 Fitting parts from Jobs 306 - 308 to bogies to completion As Listed 
 
 
 
 
 
 
 
45015 Work Plan (Year 4/5) (Stage 4) Restoration - Internal
Job No.  Description 
Equipment Involved 
Part Status
Remarks 
 S
P
C
A
M
X
 401 Manufacture/Sourcing of missing parts
(Group B - Other Components)
Automatic Voltage Regulator
Traction motor blower motors/fan assemblies
Battery charging/plug equipment board
Engine room/boiler room internal door
 
 
 
A

A







M

M

M  
 
All items of equipment to be bench tested for operation/checked for calibration before installation
(Note 2)
 402 Recondition of existing parts
(Group B - Other Components)
Electrical control cubicle
Battery Isolation Switch
Brake frame
Engine/generator
Vacuum exhauster
Radiator fan assembly/tunnel (with radiator elements)
Combined pump set (motor - rewind)
Convertor set
Fuel tanks (2)
Water tanks (2)

S

S

S







S

P

P











C

C











A








A




M













X













All items of equipment to be bench tested for operation/checked for calibration before installation


Serviceable Class 47 power unit to be obtained




(Note 3)
 403 Fit parts from Job 401 & 402 to locomotive As Listed
 
 
 
 
 
 
 
 404 Manufacture of missing cab fittings Nose end access door
Secondman's steam heat monitor panel
Traction motor access door
Engine room access doors
 
 
 
 
M
M

M

M

 
All items of equipment to be bench tested for operation/checked for calibration before installation
 405 Sourcing of missing cab fittings Secondman's steam heat monitor panel pressure gauge
Driver's desk gauges
Cooker units
Tail lamp brackets




S
 
 
 
 
X


X
X

All items of equipment to be bench tested for operation/checked for calibration before installation
 406 Recondition existing cab fittings Power controller assembly
Drivers loco air brake valve
Drivers train brake valve
AWS fittings
Seats
Heaters
Bulkhead fittings (including terminal boxes)
S

S

S
S





 




C
 
 






X

X


All items of equipment to be bench tested for operation/checked for calibration before installation
 407 Installation of all interior cab structure Floor; desk; cooker pedestal; roof lining; cab insulation
 
 
 
 
 
 
All items of equipment to be bench tested for operation/checked for calibration before installation
 408 Fit parts from Jobs 404 - 406 to locomotive As Listed
 
 
 
 
 
 
 
 409 Wiring up locomotive to wiring plan  All electrical equipment
 
 
 
 
 
 
All circuits and equipment to be tested on completion of wiring
45015 Work Plan (Year 5/6) (Stage 5) Restoration - Bogies
Job No.  Description 
Equipment Involved 
Part Status
Remarks 
 S
P
C
A
M
X
501 
Install temporary accommodation bogies under locomotive 2 bogies
 
 
 
 
 
 
Not acquired - use steel frame instead or pile of sleepers?!
 502 Remove items not required for overhaul Steps; sandboxes and valves; speedo assembly; distance counter; buffer beam fittings
 
 
 
 
 
 
 
 503 Overhaul of Bogies 1/339 & 1/340 to 'Network Haulage Standard' Bogies; axleboxes; traction motors; brake cylinders; buffers; pipework
 
 
 
 
 
 
 
 504 Repair of damaged No.1 traction motor gearwheel assembly Motor shaft
Motor pinion
Axle gearwheel
Gear casings
Pinion retaining ring
 
 
 
 



M
M

X
X
X
X
Require repair (build up damaged surface by weld, machine)


 505 Overhaul of traction motors All traction motors
 
 
 
 
 
 
 
 506 Manufacture of missing brushboxes and covers; terminal box covers and links  
 
 
 
 
M
X
 
 507 Fit items from Job 506 to motors  
 
 
 
 
 
 
 
 508 Recondition all other fittings - buffer beam hoses, couplings  
 
 
 
 
 
 
 
 509 Install overhauled bogies  
 
 
 
 
 
 
 
 510 Fit items from Job 508 to bogies  
 
 
 
 
 
 
 
 511 Reconnect bogies to all locomotive systems Brake; steam heat; vacuum; sanding systems; handbrake;
traction motor cables
 
 
 
 
 
 
 
45015 Work Plan (Year 7) (Stage 6) Equipment Testing
Job No.  Description 
Equipment Involved 
Part Status
Remarks 
 S
P
C
A
M
X
 601 Installation of batteries 96 Cells
 
 
 
 
 
 
 
 602 Testing of equipment and systems on locomotive All electrical equipment; oil, fuel and water circuits; brake systems
 
 
 
 
 
 
 
 603 Testing of power unit on locomotive Power unit (1 hour test under observation)
 
 
 
 
 
 
 
 604 Correction of any faults found followed by further test  
 
 
 
 
 
 
 
45015 Work Plan (Year 8>) (Stage 7) Miscellaneous Items
Job No.  Description 
Equipment Involved 
Part Status
Remarks 
 S
P
C
A
M
X
 701 CO2 system and fire detection equipment CO2 pipework; gas bottles; fire detectors
S
 
 
 
 
 
 
 702 CWA apparatus Stone Vapor steam generator (OK 4625)
 
 
 
 
 
 
 

NOTES

1) BG would (if it is to be used for intended purpose) require to be fitted out as a properly laid out workshop and store. Otherwise to be sold
2) Board could be constructed using parts under C above
3) Most of the Allen West relays required (same spec. number for a Class 45) are in store but some relays and most electrical (other) items required such as busbars and terminals, cable ducting etc.