"How are you planning to restore the loco?" A question frequently asked, and a very valid one considering the current state of the loco. Hopefully this page will provide some illumination of how we plan to go about this mammoth task:
PARTS STATUS CODES: -
S - Parts in Store
P - Some Parts in Store
C - Parts common to other BR Classes without modification
A - Parts could be adapted from other BR Classes (modified)
M - Parts not available from either C or A - would have to be manufactured
X - Parts available from various other sources incl. other (supportive) groups
and relics sales such as Quorn, eBay, etc.
Note - Where more than one code is listed, then more than one option applies - there are several solutions to the missing part(s) depending on 'what turns up'
45015
Work Plan 2008 (Year 1) (Stage 1) Immediate
Work and Preparation for Dismantling |
|||||||||
| Job No. | Description | Equipment
Involved |
Part
Status |
Remarks | |||||
S |
P |
C |
A |
M |
X |
||||
| 101 | Board up access to all cab doors (due to safety reasons) | All cab doorways | Until Further Notice | ||||||
| 102 | Reinstate No.1 wheelset | Replacement springs; hangers; coil springs | S |
Assess No. 1 wheelset axle bearings (SKF) for service condition | |||||
| 103 | Oil up all fastenings at least 3 times with thin oil/WD40 | All fastenings | Except where very heavily corroded - to be cut/burnt off after noting fastening details | ||||||
| 104 | Make notes of arrangement of all equipment, e.g. roof lining, pipework, etc., to completion | All equipment where required | To include photographic records | ||||||
| 105 | Label up parts in conjunction with 4) to completion | All equipment where required | Labels to be serviceable | ||||||
| 106 | Installation of workshop and stores facility with shelving/racking. Acquisition of tools for workshop | Purchase of Mk1 vehicle + flat wagon (or container) | Mk1 BG acquired (2003) but stored off site OOU. Flat wagon or container now optional. Permission may not be given for BG onsite in addition to locomotive (Note 1) | ||||||
45015
Work Plan (Year 1/2) (Stage 2) Dismantling |
|||||||||
| Job No. | Description | Equipment
Involved |
Part
Status |
Remarks | |||||
S |
P |
C |
A |
M |
X |
||||
| 201 | Remove all large items of equipment from locomotive and relocate to 1) stores or 2) flat wagon and sheet over or (3) storage facilities away from the present site | Engine room
roof panel Silencer panel Engine/generator unit Boiler (in arrangement with asbestos removal) Brake frame Vacuum exhauster Electrical control cubicle Radiator fan grille Radiator fan assembly/tunnel Fuel tanks (2) Water tanks (2) Main air reservoirs (6) Battery boxes (2) Body side grilles (2) + (2) |
|||||||
45015
Work Plan (Year 2/3) (Stage 3) Restoration
- External |
|||||||||
| Job No. | Description | Equipment
Involved |
Part
Status |
Remarks | |||||
S |
P |
C |
A |
M |
X |
||||
| 301 | Restoration of body shell including underside. Removal of cab structures. Eliminate all corrosion. New plate where required | Cab structure Nose end assembly Nose end floor Bodyside and cantrail areas Boiler room floor area |
Repaint in BR blue - transfers; BR >> | ||||||
| 302 | Restoration of bogies (outside only) | Remove all rust and corrosion. Paint in black | |||||||
| 303 | Manufacture of missing or corroded bodyshell items | Doors Handrails Boiler room roof panel Gutter sections Silencer panel (if too corroded) Bodyside (filter on 46's) cover panels Nose end filters |
M |
Or repair existing item | |||||
| 304 | Sourcing of missing bodyshell items | Various
solebar fittings - cocks and drain taps Wiper arms, blades |
C C |
||||||
| 305 | Recondition existing bodyshell items | Engine room
roof panel Radiator fan grille Main air reservoirs (6) Battery boxes (2) Bodyside grilles (2) + (2) Wiper motors |
P |
All items of equipment to be bench tested for operation/checked for calibration before installation | |||||
| 306 | Manufacture of missing bogie items | Sand valves Sand pipes * |
M M |
All items of equipment to be bench tested for operation/checked for calibration before installation | |||||
| 307 | Sourcing of missing bogie items | Sandboxes Sand pipe brackets Steps |
X X X |
||||||
| 308 | Recondition existing bogie items | Sandboxes Sand pipe brackets Steps Speedo drive Distance counter |
S S |
All items of equipment to be bench tested for operation/checked for calibration before installation | |||||
| 309 | Fitting
parts from Jobs 303 - 305 to completion (Group A - External Completion Components) |
As Listed | |||||||
| 310 | Fitting parts from Jobs 306 - 308 to bogies to completion | As Listed | |||||||
45015
Work Plan (Year 4/5) (Stage 4) Restoration
- Internal |
|||||||||
| Job No. | Description | Equipment
Involved |
Part
Status |
Remarks | |||||
S |
P |
C |
A |
M |
X |
||||
| 401 | Manufacture/Sourcing
of missing parts (Group B - Other Components) |
Automatic
Voltage Regulator Traction motor blower motors/fan assemblies Battery charging/plug equipment board Engine room/boiler room internal door |
A A |
M M M |
All items
of equipment to be bench tested for operation/checked for calibration
before installation (Note 2) |
||||
| 402 | Recondition
of existing parts (Group B - Other Components) |
Electrical
control cubicle Battery Isolation Switch Brake frame Engine/generator Vacuum exhauster Radiator fan assembly/tunnel (with radiator elements) Combined pump set (motor - rewind) Convertor set Fuel tanks (2) Water tanks (2) |
S |
P P |
C C |
A A |
M |
X |
All items
of equipment to be bench tested for operation/checked for calibration
before installation Serviceable Class 47 power unit to be obtained (Note 3) |
| 403 | Fit parts from Job 401 & 402 to locomotive | As Listed | |||||||
| 404 | Manufacture of missing cab fittings | Nose end
access door Secondman's steam heat monitor panel Traction motor access door Engine room access doors |
M M M M |
All items of equipment to be bench tested for operation/checked for calibration before installation | |||||
| 405 | Sourcing of missing cab fittings | Secondman's
steam heat monitor panel pressure gauge Driver's desk gauges Cooker units Tail lamp brackets |
S |
X X X |
All items of equipment to be bench tested for operation/checked for calibration before installation | ||||
| 406 | Recondition existing cab fittings | Power controller
assembly Drivers loco air brake valve Drivers train brake valve AWS fittings Seats Heaters Bulkhead fittings (including terminal boxes) |
S S S S |
C |
X X |
All items of equipment to be bench tested for operation/checked for calibration before installation | |||
| 407 | Installation of all interior cab structure | Floor; desk; cooker pedestal; roof lining; cab insulation | All items of equipment to be bench tested for operation/checked for calibration before installation | ||||||
| 408 | Fit parts from Jobs 404 - 406 to locomotive | As Listed | |||||||
| 409 | Wiring up locomotive to wiring plan | All electrical equipment | All circuits and equipment to be tested on completion of wiring | ||||||
45015
Work Plan (Year 5/6) (Stage 5) Restoration
- Bogies |
|||||||||
| Job No. | Description | Equipment
Involved |
Part
Status |
Remarks | |||||
S |
P |
C |
A |
M |
X |
||||
501 |
Install temporary accommodation bogies under locomotive | 2 bogies | Not acquired - use steel frame instead or pile of sleepers?! | ||||||
| 502 | Remove items not required for overhaul | Steps; sandboxes and valves; speedo assembly; distance counter; buffer beam fittings | |||||||
| 503 | Overhaul of Bogies 1/339 & 1/340 to 'Network Haulage Standard' | Bogies; axleboxes; traction motors; brake cylinders; buffers; pipework | |||||||
| 504 | Repair of damaged No.1 traction motor gearwheel assembly | Motor shaft Motor pinion Axle gearwheel Gear casings Pinion retaining ring |
M M |
X X X X |
Require
repair (build up damaged surface by weld, machine) |
||||
| 505 | Overhaul of traction motors | All traction motors | |||||||
| 506 | Manufacture of missing brushboxes and covers; terminal box covers and links | M |
X |
||||||
| 507 | Fit items from Job 506 to motors | ||||||||
| 508 | Recondition all other fittings - buffer beam hoses, couplings | ||||||||
| 509 | Install overhauled bogies | ||||||||
| 510 | Fit items from Job 508 to bogies | ||||||||
| 511 | Reconnect bogies to all locomotive systems | Brake; steam
heat; vacuum; sanding systems; handbrake; traction motor cables |
|||||||
45015
Work Plan (Year 7) (Stage 6) Equipment Testing
|
|||||||||
| Job No. | Description | Equipment
Involved |
Part
Status |
Remarks | |||||
S |
P |
C |
A |
M |
X |
||||
| 601 | Installation of batteries | 96 Cells | |||||||
| 602 | Testing of equipment and systems on locomotive | All electrical equipment; oil, fuel and water circuits; brake systems | |||||||
| 603 | Testing of power unit on locomotive | Power unit
(1 hour test under observation) |
|||||||
| 604 | Correction of any faults found followed by further test | ||||||||
45015
Work Plan (Year 8>) (Stage 7) Miscellaneous
Items |
|||||||||
| Job No. | Description | Equipment
Involved |
Part
Status |
Remarks | |||||
S |
P |
C |
A |
M |
X |
||||
| 701 | CO2 system and fire detection equipment | CO2 pipework; gas bottles; fire detectors | S |
||||||
| 702 | CWA apparatus | Stone Vapor steam generator (OK 4625) | |||||||
NOTES
1) BG would
(if it is to be used for intended purpose) require to be fitted out as a properly
laid out workshop and store. Otherwise to be sold
2) Board could be constructed using parts under C above
3) Most of the Allen West relays required (same spec. number for a Class 45)
are in store but some relays and most electrical (other) items required such
as busbars and terminals, cable ducting etc.